The proposed project is comprised of the following measures: • Replacement of the existing priority junction with a roundabout with single lane entry, exit and circulatory carriageway, including changes to toad layout and property boundaries on approach. • Provision of active travel facilities throughout the junction connecting both sides of the N15 and R232, including provision of three uncontrolled crossings. • Modification of the service station accesses and property boundary to accommodate road realignment and active travel facilities, in particular on the N15 to limit movements to left-only exit from the western access and to maintain the current entry only arrangement at the eastern entrance. • Modification of the quarry accesses and property boundary to accommodate road realignment and active travel facilities. • Associated scheme works, establishment of site compound, site clearance, earthworks, provision of surface water interceptor ditches and swales along with road gullies/drainage tying into the existing road drainage network, kerbing, pavement, accommodation works, lighting, signing and lining, service diversions or relocation, and landscaping. • All other ancillary and tie-in works to relevant standards.
| Ilmoitusnumero | 182592-2026 |
|---|---|
| Ilmoitusta kuvaavat CPV-Koodit | Rakennustyöt (45000000), Pääteiden rakennustyöt (45233121), Runkoteiden rakennustyöt (45233124), Tietyöt (45233140), Teiden korjaustyöt (45233142) |
| EUVL S | 53/2026 |
| Ilmoitustyyppi | Ilmoitus tehdystä sopimuksesta |
| Aluekoodi | |
| Osoitetiedot |
Donegal County Council_1193 Lifford procurement@donegalcoco.ie https://ted.europa.eu/en/notice/-/detail/182592-2026 |
| Osoite, johon tarjoukset tai osallistumispyynnöt on lähetettävä | |
| Liitteet | |
| Lähde | TED |