*Short description: This contract includes the design and construction of:|| - the Wastewater Treatment Plant|| - connection to the water supply system|| - connection to the power supply system|| The Contractor is required to design WWTP for the final capacity of 30,000 p.e. (Phase II capacity). The preliminary treatment facilities and the by-pass line shall also be constructed under this Contract for the Phase II capacity, while other facilities (biological and sludge treatment) shall be constructed for Phase I capacity (20,000 p.e.). The wastewater treatment process shall be based on the activated sludge process with nutrients removal and treated effluent disinfection. Sludge treatment shall include sludge pre-thickening, aerobic sludge stabilization and dewatering.|| The Contract will also include the design and construction to the water supply system for an approximate length of 975 m and to the power supply system for an approximate length of 2.000 m
Ilmoitusnumero | 106428-2024 |
---|---|
Ilmoitusta kuvaavat CPV-Koodit | Jätevedenkäsittelylaitosten rakennustyöt (45252127) |
EUVL S | 37 |
Sääntely | Ei määritelty |
Ilmoitustyyppi | Ilmoitus tehdystä sopimuksesta |
Aluekoodi | |
Osoitetiedot |
Municipality of Bijelo Polje Bijelo Polje menadzer@bijelopolje.co.me https://ted.europa.eu/udl?uri=TED:NOTICE:106428-2024:TEXT:EN:HTML |
Osoite, johon tarjoukset tai osallistumispyynnöt on lähetettävä | |
Liitteet | |
Lähde | TED |