TBESS EPC

Aachen, Saksa | Trianel BESS 1 GmbH & Co. KG
Julkaistu 2 kuukautta sitten | 21.10.2025 Määräaika: 3 viikkoa kuluttua | 22.1.2026 05:32 Alkuperäinen ilmoitus

The subject matter of the contract is the engineering, procurement and construction (EPC) of a lithium-ion battery storage facility with 80 MW of active power consumption and feed-in and a usable storage capacity of at least 160 MWh at the time of commissioning. It also within the allocated land plot. includes the inverters and transformer stations since there is 33 kV voltage at the grid connection point, as well as the electrical connection 33kV switching station up to the connection point at the point of connection of the transformer stations to the grid connection point and all ancillary equipment and infrastructure necessary for proper and safe operation. Construction will take place on the site of Trianel Batteriepark Waltrop GmbH & Co. KG (TBW) in 45731 Waltrop, Germany. For further information please see tender documents.

Ilmoitusnumero 696878-2025
Ilmoitusta kuvaavat CPV-Koodit Öljytuotteet, polttoaineet, sähkö ja muut energian lähteet (09000000), Rakennustyöt (45000000)
EUVL S 203/2025
Ilmoitustyyppi Hankintailmoitus (tarjouspyyntö)
Aluekoodi
Osoitetiedot Trianel BESS 1 GmbH & Co. KG
Aachen
b.marten@trianel.com
https://ted.europa.eu/en/notice/-/detail/696878-2025
Osoite, johon tarjoukset tai osallistumispyynnöt on lähetettävä
Liitteet
Lähde TED