Microtunnel Landfall Vierow

Berlin, Saksa | 50Hertz Offshore GmbH
Julkaistu 2 viikkoa sitten | 9.7.2026 Alkuperäinen ilmoitus

As part of the scope of this tender, the Contractor shall be responsible for the design and construction of two microtunnels (MTs). Each microtunnel shall accommodate ducts for three high-voltage direct current (HVDC) power cables and fibre optic cables.
The landfall for the planned Ostwind 4 (OW4) HVDC cable system is located in Vierow, on the shores of the Greifswalder Bodden in Mecklenburg-Western Pomerania, Germany. For this landfall, the construction of one microtunnel with cable ducts is foreseen.
The landfall for the planned Bornholm Energy Island (BEI) HVDC cable system is likewise located in Vierow, at the Greifswalder Bodden. Here, the construction of one microtunnel with cable ducts is also planned.
The landfall for the BEI project on the island of Bornholm is not included in the scope of this tender. Furthermore, the delivery and installation of the power cables are not part of this tender either.
The landfall structure will be used to accommodate power cables. The subject of the contract is the full scope required for the planning and execution of the complete landing structure.

Ilmoitusnumero 476714-2026
Ilmoitusta kuvaavat CPV-Koodit Putkijohtojen, tietoliikenne- ja voimalinjojen, teiden, lentokenttien ja rautateiden rakentamistyöt; maanpinnoitus (45230000), Vesirakennustyöt (45240000)
EUVL S 131/2026
Ilmoitustyyppi Ilmoitus tehdystä sopimuksesta
Aluekoodi
Osoitetiedot 50Hertz Offshore GmbH
Berlin
marcus.hoeffler@50hertz.com
https://ted.europa.eu/de/notice/-/detail/476714-2026
Osoite, johon tarjoukset tai osallistumispyynnöt on lähetettävä
Liitteet
Lähde TED