Helium Refrigeration System (HRS) for Isotope Separation System (ISS) of ITER Fuel Cycle

Barcelona, Espanja | The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')
Julkaistu 1 kuukausi sitten | 31.8.2026 Määräaika: 2 kuukautta kuluttua | 1.12.2026 03:53 Alkuperäinen ilmoitus

The scope of this procurement procedure is the design, manufacturing, assembly, factory acceptance testing, transport and delivery of the Helium Refrigeration System (HRS) for the Isotope Separation System (ISS) within the Tritium Plant at ITER, based on Reversed Turbo-Brayton technology. The HRS will supply a cooling net power of approximately 1500 W at 18.5 K for the ISS of the ITER Tritium Plant.
Optional scope: Option 1: factory performance testing; Option 2: technical assistance for on-site installation and final connection activities; Option 3: technical assistance for commissioning and site acceptance testing. Before the final call for tender, F4E may decide to remove certain options from the scope.

Ilmoitusnumero 601126-2026
Ilmoitusta kuvaavat CPV-Koodit Kylmälaitteet (42513200)
EUVL S 168/2026
Ilmoitustyyppi Hankintailmoitus (tarjouspyyntö)
Aluekoodi
Osoitetiedot The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')
Barcelona
Fanny.Cauvard@f4e.europa.eu
https://ted.europa.eu/en/notice/-/detail/601126-2026
Osoite, johon tarjoukset tai osallistumispyynnöt on lähetettävä
Liitteet
Lähde TED