The Contract covers the detailed design and construction of approximately 22.1 km of new single-track railway between Kriva Palanka and the border area with the Republic of Bulgaria, forming Section 3 of Railway Corridor VIII – Eastern Section. The railway will have a maximum design speed of 100 km/h. The Works include Kriva Palanka station, Zidilovo halt/station, 21 tunnels with a total length of approximately 8.5 km, 51 bridges/viaducts with a total length of approximately 5 km, permanent way, earthworks, drainage, retaining structures, access roads and associated civil and interface works. The cross-border tunnel and its functional area are excluded from this Contract.
| Ilmoitusnumero | 659550-2026 |
|---|---|
| Ilmoitusta kuvaavat CPV-Koodit | Rautateiden rakennustyöt (45234100) |
| EUVL S | 185/2026 |
| Ilmoitustyyppi | Hankintailmoitus (tarjouspyyntö) |
| Aluekoodi | |
| Osoitetiedot |
Public Enterprise for Railway Infrastructure Railways of the Republic of North Macedonia – Skopje (ZRSMI) Skopje phase3@mzi.mk https://ted.europa.eu/en/notice/-/detail/659550-2026 |
| Osoite, johon tarjoukset tai osallistumispyynnöt on lähetettävä | |
| Liitteet | |
| Lähde | TED |