Supply of a landfill and bio gas blower station at HSY Ämmässuo landfill gas motor power plant CHP1. The contract includes as described in the tender request documents, for example, as follows: - Supply of gas blower station including Auxiliary Equipment as specified in the tender request documentation - Installation Supervision and Commissioning On-Site including Side Costs - Operation and Maintenance Manuals - Transport of the Equipment to the Customer - Training for the Operating Personnel More detailed information is provided in the tender request documentation. In this procurement procurement act is not followed. According to Commission Decision (2006/422/EC), the Procurement Directive for specific sectors does not apply to contracts awarded by contracting entities such as for the purpose of enabling them to produce or sell electricity in Finland, with the exception of the Åland Islands. The procurement act does not apply in the procurement concerning Ämmässuo landfill gas power plant CHP 1, as ruled by the Supreme Administrative Court in Finland in 2013. Therefore, this procurement Peak Power Electricity Production with CHP 1 - Lot C: CHP1 gas storage gas blower station no. 5, contract number 24412 is carried out outside the procurement act.
Ilmoitustyyppi: Oikaisuilmoitus
Sahamyllynrinne ja Hernepellontie, louhintaurakka, kokonaisurakka
Rakennustyö käsittää Sahamyllynrinteen ja Hernepellontien hankkeen rakentamisen tarjouspyyntöasiakirjojen mukaisesti kaikkine töineen ja hankintoineen täysin valmiiksi. Urakkarajaukset: Tämä urakka käsittää Sahamyllynrinteen ja Hernepellontien louhinta- ja lujitustyöt sekä Hernepellontien ennallistamisen urakka-asiakirjojen osoittamassa laajuudessa. Louhinnan yläpinta tulee kiilata. Lopullinen pinta tulee tasata louhinnan teoreettiseen pintaan 0-90 murskeella. Urakkamuotona on kokonaisurakka, jossa työhön valittu urakoitsija toimii YSE:n ja lainsäädännön tarkoittamana pääurakoitsijan asemassa toimivana päätoteuttajana. Urakoitsija vastaa työmaan johtovelvollisuuksista ja työmaapalveluista. Työ tehdään kokonaishintaurakkana. Työmaa toteutetaan kokonaisuudessaan vähäpäästöisenä työmaana, jonka vaatimukset löytyvät urakkarajaliitteestä. Suunnitelmissa esitetyt määrät eivät ole tilaajaa sitovia. Urakoitsijaksi valitaan kokonaistaloudellisesti edullisimman tarjouksen antanut tarjoaja. Kokonaistaloudellisesti edullisin on tarjous, joka on rakennuttajan asettamien tarjoajan soveltuvuutta koskevien vaatimusten täyttävistä tarjouksista hinnaltaan halvin. Tilaajaan sopimussuhteessa olevan urakoitsijan alihankkijalla/aliurakoitsijalla on oikeus antaa urakka edelleen alihankintana/aliurakkana. Hankinnan/urakan ketjuttaminen tätä pidemmälle ei ole mahdollista ilman erityisen perusteltua syytä ja siihen on saatava tilaajan/rakennuttajan kirjallinen suostumus. Urakka-asiakirjojen mukaisten töiden tulee olla valmiina ja vastaanotettuna sekä viranomaisten ja tarkastavien laitosten vaatimat tarkastukset hyväksytysti pidettynä 30.9.2025. Välitavoite: Hernepellontie tulee ennallistaa liikenteelle (ajokaistat molempiin suuntiin sekä jk-pp-väylä, kaikki päällystettynä (tai olosuhteista riippuen toiminnallisessa kunnossa)) 30.4.2025 mennessä.
Kulttuurikeskuksen rakentaminen, Inkoo
Hankinta käsittää kulttuuritapahtumien järjestämiseen soveltuvan salirakennuksen rakentamisen piha-alueineen urakkalaskenta-asiakirjojen mukaisesti. Kohde käsittää 760 k-m2 kokoisen laajennuksen olevaan kunnantaloon. Lisäksi urakkaan sisältyy laajennusosaa palvelevien kunnantalon tilojen rakennus- ja taloteknisiä töitä. Hankkeen urakkamuoto on kokonaisurakka. Hankinta käsittää kaikki kohteen toteuttamiseksi tarvittavat työt ja toimet uuden rakennuksen 760 k-m2 rakentamiseksi käyttövalmiiseen kuntoon piha- ja aluetöineen ja asiakirjojen mukaisine järjestelmineen, kalusteineen ja varusteineen. Urakkaan sisältyy lisäksi piha- ja liikennealueiden rakentamista. Kulttuurikeskuksen kunnantalon puolella sijaitsevat aulatilat noin 350 k-m2 on valmistettu aiemmassa kunnantalon korjausurakassa, joka valmistuu urakkasopimuksen mukaan 30.4.2025. Aikataulullisesti tulee varautua, että mm. muuton vuoksi rakennustyöt olevan rakennuksen sisätiloissa voivat käynnistyä aikaisintaan noin 15.5.2025. Kunnantalon puolella tämän hankinnan käsittämään urakkaan jää mm. seuraavia tehtäviä: - yleisö-WC:iden rakentaminen - 2. krs lipputiskin ja naulakkotilojen rakentaminen - aulatilojen IV-työt ja alakattojen ummistaminen IV-töiden vaatimalla alueella - laajennusosan liittäminen kunnantaloon - opasteita - uudet sähkönsyöttöjohdotukset Laajennusosa toteutetaan tilaajan suunnitelmilla, poislukien jälkijännitetty laatta (kattorakenne), jonka osalta myös suunnittelu kuuluu urakkaan. Urakkalaskentamateriaali sisältää ifc-mallin, joka ei kuitenkaan sido tilaajaa, vaan sen tarkoitus on tukea urakoitsijaa hankekokonaisuuden hahmottamisessa. Tilaajan tavoitteena on, että tämän hankinnan käsittämä urakka voi käynnistyä 1.4.2025, hankintaprosessin etenemisestä riippuen ja urakka-aika, sisältäen vastaanottovaiheen tehtävät, on 17 kk eli urakka valmistuu 31.8.2026. Tilaaja järjestää selonottoneuvottelut 1-3 tarjoajan kanssa alkaen 22.1.2025 Selonottoneuvotteluun saavuttaessa tulee esittää urakkaohjelman ja tarjouspyynnön mukaan seuraavia dokumentteja: - tilaajavastuulain mukaiset tiedot, mikäli tarjous ei sisällä niitä - hankkeeen toteuttavan henkilöstön CV:t (alustavat tiedot) - yksikköhintaluettelo (kts. urakkaohjelma)
Olarin talvipuutarha ja nuorisotila rakenteellinen korjaus
Espoon kaupunki Tilapalvelut-liikelaitos (myöhemmin Tilaaja) pyytää tarjouksia Olarin talvipuutarhan ja nuorisotilan rakenteellisesta korjauksesta tarjouspyynnön liitteenä olevien asiakirjojen mukaisesti täyteen käyttökuntoon saatettuna. Hankkeelle on olemassa voimassa oleva rakennuslupa, rakennuslupapäätös on tarjouspyynnön liitteenä. Tarjoajan tulee huomioida rakennusluvan ehdoissa pääurakoitsijalle osoitetut velvoitteet. Korjaustyö toteutetaan kokonaisurakkamuotona. Kaikki tarjouspyynnössä esitetyt työt ja hankinnat sisältyvät kokonaisurakkaan. Kokonaisurakoitsija toimii hankkeessa pääurakoitsijana sekä maankäyttö- ja rakennuslain tarkoittamana päätoteuttajana. Tilaaja tulee valitsemaan kilpailutuksen perusteella yhden toimittajan. Kohteen osoite on Ruomelanraitti 9, 02210 Espoo. TUTUSTUMISKÄYNTI Tilaaja edellyttää Tarjoajan tutustuvan rakennuspaikkaan ja siinä vallitseviin olosuhteisiin ennen sitovan tarjouksen tekemistä. Pakollinen tutustumiskäynti järjestetään 5.12. klo 9-11 ja 12.12. klo 9-11. Tilaaja hylkää tarjouksen, mikäli tarjoaja ei ole tutustunut kohteeseen. Tutustumiskäynnille tulee ilmoittautua etukäteen viimeistään haluttua tutustumispäivää edeltävänä arkipäivänä klo 12:00 mennessä sähköpostilla osoitteeseen anne-maija.holmstrom@espoo.fi. Mikäli ilmoittautumisia ei tule määräaikaan mennessä, varaa Tilaaja oikeuden siirtää tutustumiskäyntiä, mistä ilmoitetaan erikseen Tarjouspalvelu.fi -toimittajaportaalissa. Tarjoajaa koskevat referenssivaatimukset ovat tarkemmin kuvattu tarjouspyynnön kohdassa Soveltuvuusvaatimukset.
Taiteen ja kulttuurin tilat, Hyökkälä
Koulutoiminnalta vapautuva, 1954 valmistunut ja arkkitehtien Viljo Revellin ja Osmo Sipa-rin suunnittelema koulurakennus peruskorjataan taiteen ja kulttuurin käyttöön. Ensimmäi-sessä vaiheessa kunnostetaan A-osan eli koulun luokkasiipi työ- ja kokoelmatiloiksi, myö-hemmin kunnostetaan yleisökäyttöön tarkoitetut tilat, mm. näyttely- ja kahviotilat. Hank-keen toiminnalliset ja laadulliset tavoitteet on esitetty hankesuunnitelmassa. Peruskorjattava rakennus on asemakaavalla suojeltu. Kunnostettaviin tiloihin sijoitetaan kunnan taidekokoelmat, joista osaa koskee Kansallisgallerian tiloille asetetut olosuhdevaatimukset. Nämä huomioidaan suunnittelijoiden vaativuustason hyväksynnässä. Rakennus on liitetty yhteen 1980 rakennettuun yläkouluun vuonna 2004 valmistuneella osalla. Yläkouluin tilat puretaan ja liittymäkohdiltaan ummistetaan erillisellä hankkeella. Tilojen purkaminen edellyttää toteutuksen ensimmäisessä vaiheessa mm. paloilmoitin- ja turvatekniikankeskuksien korvaamista säilytettävillä alueilla. Hankkeen laajuus- ja kustannustavoitteet määritetään ja niiden toteutumista seurataan laadittavien tavoitehinta- ja rakennusosa-arviolaskelmien perusteella. Hankkeen tavoitteet täsmennetään suunnittelun alkuvaiheessa suunnitteluryhmän kanssa. Hankkeen suunnittelumuotona on osina suunnittelu ja toteutusmuotona on pääurakka alis-tetuin sivu-urakoin. Suunnittelu alkaa tammikuussa 2024 ja sille on varattu aikaa n. 6 kk. Tarjouspyynnön aineisto löytyy kohdasta Liitteet ja linkit. (One Drive) Pää- ja arkkitehtisuunnittelu Hankkeen pää- ja arkkitehtisuunnittelu Rakennesuunnittelu Hankkeen rakennesuunnittelu LVIA-suunnittelu Hankkeen LVIA-suunnittelu Sähkösuunnittelu Hankkeen sähkösuunnittelu
KORJAUSILMOITUS: Pora-saha -järjestelmien hankinta leikkaus- ja anestesiayksikköön
Kanta-Hämeen hyvinvointialueen (Oma Häme) hankinta pora-sahajärjestelmistä Kanta-Hämeen keskussairaalan leikkaus- ja anestesiayksikköön. Sopimuskauden aikana tullaan hankkimaan 2 pientä pora-sahajärjestelmää, 7 isoa protetiikkaa ja 2 isoa traumajärjestelmää. Edellä mainitut määrät ovat ehdollisia ja vaativat hyvinvointialueen budjettien hyväksyntää. Pieni traumapora Kanta-Hämeen hyvinvointialueen (Oma Häme) hankinta pora-sahajärjestelmistä Kanta-Hämeen keskussairaalan leikkaus- ja anestesiayksikköön. Osa-alue 1 sisältää pienet traumaporat. Iso trauma + lonkkaprotetiikka Kanta-Hämeen hyvinvointialueen (Oma Häme) hankinta pora-sahajärjestelmistä Kanta-Hämeen keskussairaalan leikkaus- ja anestesiayksikköön. Osa-alue 2 sisältää isot traumaporat + lonkkaprotetiikan. Iso protetiikan pora/saha Kanta-Hämeen hyvinvointialueen (Oma Häme) hankinta pora-sahajärjestelmistä Kanta-Hämeen keskussairaalan leikkaus- ja anestesiayksikköön. Osa-alue 3 sisältää isot protetiikan porat/sahat.
Metsätyöt Kouvolan kaupungille 2025-2027
Kouvolan kaupunki hakee puitejärjestelykumppaneita metsätöihin kaupungin omistamille metsä- ja viheralueille kaudelle 2025 - 2027. Metsätyöt käsittää metsuri- ja konetyötä erilaisissa kaupungin metsä- ja viheralueilla sekä yhdyskuntateknisissä rakennus- ja työkohteissa. Kohteet ovat pääosin taajamametsäalueilla ja rakennetuilla viheralueilla. Työkohteet sijaitsevat Kouvolan kaupungin alueella. Metsänhoitotöissä noudatetaan kaupungin Taajamametsien hoitoperiaatteita sekä viheralueiden hoitoluokitusta (VYL). Kouvolan kaupungin metsät ovat PEFC-sertifikoituja. Taajamametsien hoitoperiaatteet löytyvät kaupungin nettisivuilta osoitteesta http://www.kouvola.fi/metsat. Metsurityöt sekä keskikokoinen monitoimimetsäkone ja ajokone Metsurityöt sekä monitoimimetsäkone ja ajokone. Metsurityöt hehtaarihinnalla Metsurityöt hehtaarihinnalla. Metsurityöt sekä maataloustraktori vähintään 8m3 perävaunulla Metsurityöt sekä maataloustraktori Metsurityöt sekä giljotiiniauto Metsurityöt sekä giljotiiniauto Metsurityöt sekä maataloustraktori vähintään 25m3 perävaunulla Metsurityöt sekä maataloustraktori vähintään 25m3 perävaunulla Metsurityöt tuntihinnalla Metsurityöt tuntihinnalla [OPTIO] Kantojyrsin Kantojyrsin
Ravintolapalveluiden hankinta
Asiassa on kyse palvelusopimuksesta, jonka tarkoituksena on hankkia arviolta 1.1.2026 käyttöönotettavan kampuksen alueella sijaitsevien koulun ja päiväkodin ruokahuollolle, kulttuuritalon kahvila- ja ravintolapalveluille sekä tapahtumien tilausravintolapalveluille Palveluntuottaja. HUOM! Kyse ei ole julkisista hankinnoista ja käyttöoikeussopimuksista (1397/2016) annetun lain mukaisesta julkisesta hankinnasta. Hankinta on julkaistu pienhankinnan pohjalla ainoastaan sen korostamiseksi, ettei kyse ole julkisesta hankinnasta. Tarjoajia pyydetään arvioimaan hankinnan laajuutta tarjousasiakirjoihin sisältyvän hankinnan kuvauksen perusteella. Sopimuksen kohde on jaettu seuraaviin osa-alueisiin: 1. koulun ja päiväkodin ruokahuolto 2. kulttuuritalon kahvila- ja ravintolapalvelut 3. tilausravintolapalvelut kulttuuritalon tapahtumiin Tarjoajan tulee tarjota kaikkia osa-alueita. Osatarjoukset eivät ole sallittuja. Sopimus tehdään yhden (1) tarjoajan kanssa.
Ypäjän hautausmaan korjaukset
Ypäjän seurakunta pyytää tämän hankintailmoituksen ja sen liitteenä olevien urakka-asiakirjojen laajuuden mukaista kokonaisurakkatarjousta Ypäjän hautausmaan korjaus- ja muutostöistä. Urakka-asiakirjoissa on ilmoitettu tarkemmin työsisältö. Ypäjän seurakunta pyytää tämän hankintailmoituksen ja sen liitteenä olevien urakka-asiakirjojen laajuuden mukaista kokonaisurakkatarjousta Ypäjän hautausmaan korjaus- ja muutostöistä. Urakka-asiakirjoissa on ilmoitettu tarkemmin työsisältö.
Liikuntaneuvonta ja -palveluhankinta
Joutsan kunta hakee kokonaishankintaa kunnan toteuttamista liikuntapalveluista. Palveluihin sisältyy kunnan matalan kynnyksen liikuntaryhmät, vesiliikuntaryhmät sekä kunnassa toteutettava liikuntaneuvontapalvelu Hankintamenettelyllä haetaan tarjouksia kunnan matalan kynnyksen liikuntaryhmien ohjaukseen ajalla tammikuu 2025-joulukuu 2027. Kyseessä on avoin menettely. Ohjaukseen sisältyvät vesijumpat ja vesiliikunta Leivonmäen uimahallissa, liikuntaryhmien ohjausta Leivonmäellä sekä Joutsan taajamassa. Lisäksi haetaan liikuntaneuvonnan toimintamallia toteuttavaa tarjoajaa. Toimintaan voi tutustua osoitteessa: https://www.joutsa.fi/vapaa-aika/liikuntaneuvonta/ Liikuntaneuvonnan palvelukonseptista voi lukea enemmän: https://liikuntaneuvonta.fi/ Hankinta on arvoltaan kansallisen kynnysarvon on ylittävä. Tarjousta pyydetään kolmen vuoden ajalle. Hankinta ja sen arvo vahvistuu lopullisesti Joutsan kunnanvaltuuston hyväksyttyä vuoden 2025 talousarvion. Tarjouspyyntöaika on kuukauden mittainen . Hankintaan, haetun palvelun tarkempiin sisältöihin ja tuntimääriin saa lisätietoa kysymällä hankinnan ja toiminnan toteutuksen osalta 26.11.2024 mennessä. Tehdyt kysymykset ja vastaukset julkaistaan hankintaportaalissa.
Technical Assistance service for the Implementation of Forestry, Land Use and Value Chains Development in Tanzania (FORLAND)
The Unit for the Horn of Africa and Eastern Africa (hereinafter referred to as “Contracting Authority”) calls for this Invitation to Tender (ITT) with a purpose of requesting tenders on Technical Assistance service for the Implementation of the project Forestry, Land Use and Value Chains Development in Tanzania (FORLAND) (project code 28235974). The FORLAND project will be implemented in coordination with the Tanzanian Ministry of Natural Resources and Tourism (MNRT). The project is implemented in 19 Districts in Iringa, Njombe, Ruvuma and Lindi Regions. FORLAND will build on the results of the previous forestry projects, namely Participatory Plantation Forestry Programme (PFP2) and Forestry and Value Chains Programme (FORVAC). The estimated value of the procurement is 5,942,200 euros (including Technical Assistance fees and reimbursable costs, VAT excluded) + an option of 3,000,000 euros. The option includes technical assistance fees and reimbursable costs. Duration of the contract will be four years with an option period of two years. Other funds to be channeled through the Consultant according to the Project Document are operational costs of 13,657,800 euros and contingency of 400,000 euros. The total amount of channeled funds is therefore 20,000,000 euros. Project Document ("PD FORLAND May 2024") includes a more detailed description of the object of the contract. Information on the previous projects can be found in the annexes and on the Embassy of Finland in Dar es Salaam website (https://finlandabroad.fi/web/tza/). The contract will be awarded through an open procedure. The procurement will take place in compliance with the Act on Public Contracts and Concession Contracts (1397/2016). The contract concerns a service procurement exceeding EU threshold which is based on a development cooperation agreement between the contracting authority and the partner country (on grounds 8 § paragraph 2 of the Act on Public Contracts and Concession Contracts, the procurement will be conducted through National Procedures). The processing of Tenders will progress in the following steps: 1. Publishing the call for tenders 2. Opening of tenders 3. Evaluation of the suitability of the tenderers 4. Verifying that the tenders of the suitable tenderers and the services tendered fulfil the requirements 5. Quality comparison of tenders that fulfil the requirements 6. Interviews 7. Price comparison 8. Contract award decision and notification. Appeal period two (2) weeks from the notification. 9. Verifying the fulfilment of the suitability requirements of the selected tenderer 10. Signing the Contract with the selected service provider. The Contracting Authority may wholly or partially suspend the procurement procedure for a justified reason. The signing of the contract with the selected Tenderer and the commencement and continuation of the implementation of the Project are subject to the intergovernmental agreement on the project being in force. No compensation will be payable to tenderers for preparing a tender, presenting it or otherwise taking part in the procedure. The tender documents are available in English language and the tender shall also be submitted in English language. Should the tenderer wish to obtain the tender documents in another language, they shall themselves arrange for their translation and bear the costs thus incurred. The Contracting Authority selects one (1) service provider and concludes a contract with that service provider. The amount of Services to be supplied is an estimate and does not form an obligation for the Contracting Authority to buy that amount of Services. The contract does not give an exclusive right to the service provider to supply the Contracting Authority. Should several tenderers have appointed the same expert for their tender, tenderers remain responsible for making an agreement on how they will possibly protect their own trade secrets or ensure the effective availability of the appointed expert resource during the contract period if one appointed expert was working for several tenderers. Additionally, the Ministry for Foreign Affairs requires that the expert commits to confidentiality as regards the content of the interviews. If same person is appointed in several tenders (and thus would participate in the interview several times), that person will only participate in the first interview. The tenders, in which that person has been appointed, will be given the same number of points. Additionally, in order to ensure that tenderers will be treated in an equitable and non-discriminatory manner, the interviews in which the person does not participate will be proportionally shorter. If this is the case, the Ministry for Foreign Affairs will provide more detailed information and instructions before the interviews.
Terminaali- ja kuljetuspalvelu Pirkanmaan Voimialle
Terminaali- ja kuljetuspalvelu Pirkanmaan Voimialle Tuomi Logistiikka Oy kilpailuttaa Pirkanmaan Voimian toimeksiannosta terminaali- ja kuljetuspalvelun Pirkanmaan Voimia Oy:n hoidon liiketoiminnan toimipaikkoihin.
Palveluntuottajan terminaalissa vastaanotetaan tavarantoimittajien kuormat ja yhdistetään ne tuotantokeittiöistä noudettavien ateriakuormien, Tuomen varastolta noudettavien Kori-verkkokauppatuotteiden ja Prismasta noudettavien kauppakassituotteiden kanssa toimipaikkakohtaisiksi kuormiksi, jolloin kuljetuksien määrät toimipaikkoihin vähenevät. Palveluntuottajan terminaalin tulee sijaita Tampereella tai Tampereen ympäristökuntien alueella.
Terminaalista kuljetetaan yhdistetyt kuormat palvelu- ja alueellisiin keittiöihin, ja Tampereella ja naapurikunnissa sijaitseviin toimituspisteisiin.
Terminaalipalvelun kautta saadaan kaikille maakunnan toimipaikoille yhtenäinen tuotevalikoima ja toimintaan sopivat toimituspäivät.
Tarkempi palvelunkuvaus löytyy tarjouspyynnön liitteenä olevalta Palvelukuvaukselta (liite 2) ja toimipaikkalistaus löytyy tarjouspyynnön liitteeltä 4 Kuljetusliite.
Palvelun tavoitteellinen aloitus on maalis-kesäkuu 2025. Tarkemmin palvelun aloitus määritellään hankintapäätöksen lainvoimaisuuden saamisen jälkeen.
Sopimuskauden kesto on kaksi (2) vuotta, jonka jälkeen sopimusta voidaan jatkaa yhteisesti sopimalla toistaiseksi voimassaolevana.
Voimian asiakastoimituspaikoissa on erilaisia piha- ja lastausolosuhteita, joihin tarjoajan on mahdollista käydä tutustumassa itsenäisesti. Tutustumiskäynnillä mahdollisesti esiin nousseet kysymykset on esitettävä Tarjouspalvelun kautta lisätietokysymysten määräaikaan mennessä.,
RAAHEN SATAMA OY BOTHNIA WIND SYVÄLAITURI 3 RAKENNUSURAKKA
RAAHEN SATAMA OY BOTHNIA WIND SYVÄLAITURI 3 RAKENNUSURAKKA Raahen Satama Oy rakennuttaa uuden Syvälaiturin Raahen satamaan; uutta laituria rakennetaan 173 m ja sen taustalle uutta satamakenttää n. 40 m leveydeltä. Uusi laituri on suunniteltu toteutettavan taustamaahan ankkuroitavana teräsbetonisena kulmatukimuurilaiturina, jossa kantavien kulmatukimuurielementtien väleihin asennetaan levymäiset saumaelementit. Laituri- ja laiturin tausta-alueen vesijohto, jäte- ja hulevesiviemäröinti ja sähköistystyöt ml. sähkötilan rakentaminen kuuluvat urakkaan; laituri-, alueinfra-, sähkö- ja sähkötilatyöt toteutetaan työselitysten mukaan. Laiturin taustalle aiemmin rakennetun kokoonpanoalueen profilointi ja päällystystyöt kuuluvat urakkaan. Työ suoritetaan kokonaisurakkana.,
Diabeettisen retinopatian seulontapalvelut
Diabeettisen retinopatian seulontapalvelut Lapin hyvinvointialue on Pyytää tarjouksia diabeettisen retinopatian seulontapalveluihin sopimuskausille neljän vuoden sopimuskaudelle. Hankittava palvelukokonaisuus sisältää:
1. Ajanvaurauksen
2. Silmänpohjakuvauksen
3. Kuvien analysoinnin lausuntoineen
4. Lausuntojen ja kuvien siirto Lapin hyvinvointialueen järjestelmiin
5. Lähetteiden teon jatkotutkimuksiin
Palvelun on sisältö on määritelty tarkemmin palvelun liitteenä olevassa olevassa palvelukuvauksessa.
Seulontatutkimus on suoritettava kaikkien voimassa olevien viranomaismääräysten edellyttämällä tavalla ja standardoituja seulontakäytäntöjä noudattaen, ajanmukaisella digitaalisella kuvantamistekniikalla. Palveluntuotannossa on huomioitava, että toiminnan tulee täyttää säteilylain (859/2018) mukaiset vaatimukset ja sen nojalla annettujen valtioneuvoston asetuksen ionisoivasta säteilystä (1034/2018), sosiaali- ja terveysministeriön asetuksen ionisoivasta säteilystä (1044/2018) ja sosiaali- ja terveysministeriön asetuksen ionisoimattomasta säteilyn väestölle aiheuttaman altistuksen rajoittamisesta (1045/2018) mukaiset vaatimukset, mutta myös muita mahdollisia määräyksiä on noudatettava.
Seulontatutkimukset toteutetaan Enontekiön, Inarin, Kemijärven, Kittilän, Kolarin, Muonion, Pelkosenniemen, Pellon, Ranuan, Rovaniemen, Sallan, Savukosken, Simon, Sodankylän, Utsjoen ja Ylitornion diabeettisen retinopatian seulontatutkimusten piiriin kuuluville. Seulontaan kutsuttujen ja osallistuneiden määrä vuonna 2023 on kuvattu kuntakohtaisesti tarjouspyynnön liitteenä olevassa palvelukuvauksessa.
Hankinnan optiona on Tervolan ja Posion diabeettisen retinopatian seulontatutkimukset voidaan ottaa sopimuksen piiriin myöhemmin, jolloin palveluntuotanto alkaa sovitun kalenterivuoden alusta, kuitenkin aikaisintaan vuonna 2027.
Hankintasopimus tehdään toistaiseksi voimassa olevana. Hankinnan arvo hankintakaudella optiosopimuskaudet mukaan luettuna on arviolta noin 720 0000 €.
Lapin hyvinvointialue ei sitoudu tiettyyn hankintamäärään, vaan palvelua hankitaan asiakasmäärän ja heidän tarpeiden mukaisesti.,
Teollisuushalli Tiilitie 31 Teuva Betonielementtihankinta
Teuvan kunnan elinvoima toimiala pyytää tarjoustanne kunnan uuden teollisuushallin BETONIELEMENTEISTÄ, BETONIPILAREISTA, VSS-ELEMENTEISTÄ SEKÄ RUNKOON OLENNAISESTI LIITTYVISTÄ RAKENNEKOKONAISUUKSISTA SUUNNITTELUINEEN ASENNUKSINEEN. Tarkemmat laajuustiedot annettu hankinnan kuvauksessa. Kohteen laajuustietoja seuraavasti: • Julkisivuelementit n. 3140 m2 joissa 37 ikkunaa koko 12x9 L*H ja 5 isoa nosto-ovea. • Elementin pinta ulkopuolella hienopesty mustalla pigmentoitu betoni, julkisivukuvaan merkityt tehostevärit sileä mustaksi pigmentoitu betoni. • Betonipilareita pitkät sivut 36 kpl L= n.8080 lattiapinnasta pilareissa siltanosturi konsolit. Siltanosturi 2x 5tn samalla radalla, nosturin kiskoja varten konsoleissa oltava kiinnityslevyt • Betonipilarit päädyt 6 kpl lattiapinnasta ei konsoleita • Pilareissa käytettävä betoni on oltava GWP-luokiteltua ja GWP-arvon on oltava 85, tai sitä pienempi. • Vss-seinäelementit pohjan mukaan tilaajan VSS-valu osilla • Liimapuupalkit L= 25 000 suunnittelu palkkitoimittaja. sis. urakkaan. • Kattolaattaelementit alushuovalla n. 2925 m2 suunnittelu kattoelementti toimittaja. sis. urakkaan. Alapintana kipsilevy. • Betonirungon jäykisterakenteet rakennesuunnittelija suunnittelee, • Betonielementtien pystysaumavalut • Tarjoukseen kuuluttava rahdit, asennustarvikkeet, liitososat, oman urakan työmaapalvelut, koneet, aputyöt, nosturit ja henkilönostimet pystytykselle. • Betonielementtisuunnittelun tietojen jako perustus suunnittelijalle. • Kohde liittyy ilmastoviisas hankkeeseen, niin toteutetaan elementtien eristys lämpimän tilan eristysmääräysten mukaan. • Katolle tulevien IV-koneiden kuormitustiedot annetaan kysymysten ja vastausten yhteydessä. • Muista työhön liittyvistä yksityiskohdista sovitaan solmittavassa urakkasopimuksessa.
KORJAUSILMOITUS: Pora-saha -järjestelmien hankinta leikkaus- ja anestesiayksikköön
Kanta-Hämeen hyvinvointialueen (Oma Häme) hankinta pora-sahajärjestelmistä Kanta-Hämeen keskussairaalan leikkaus- ja anestesiayksikköön. Sopimuskauden aikana tullaan hankkimaan 2 pientä pora-sahajärjestelmää, 7 isoa protetiikkaa ja 2 isoa traumajärjestelmää. Edellä mainitut määrät ovat ehdollisia ja vaativat hyvinvointialueen budjettien hyväksyntää. Pieni traumapora Kanta-Hämeen hyvinvointialueen (Oma Häme) hankinta pora-sahajärjestelmistä Kanta-Hämeen keskussairaalan leikkaus- ja anestesiayksikköön. Osa-alue 1 sisältää pienet traumaporat. Iso trauma + lonkkaprotetiikka Kanta-Hämeen hyvinvointialueen (Oma Häme) hankinta pora-sahajärjestelmistä Kanta-Hämeen keskussairaalan leikkaus- ja anestesiayksikköön. Osa-alue 2 sisältää isot traumaporat + lonkkaprotetiikan. Iso protetiikan pora/saha Kanta-Hämeen hyvinvointialueen (Oma Häme) hankinta pora-sahajärjestelmistä Kanta-Hämeen keskussairaalan leikkaus- ja anestesiayksikköön. Osa-alue 3 sisältää isot protetiikan porat/sahat.
Padasjoen Mustanlahdenkärjen mökkitien tekeminen
Hollolan seurakunta pyytää tarjousta Padasjoen Mustanlahdenkärjen mökkitien tekemisestä. Padasjoen Mustanlahdenkärjen mökkitien tekeminen tarjouspyynnön liitteenä olevien urakka-asiakirjojen mukaisesti.
Siltanosturihankinta, Teollisuushalli Tiilitie 31 Teuva
Teuvan kunnan elinvoima toimiala pyytää tarjoustanne kunnan uuden teollisuushallin KAHDESTA YKSIPALKKISESTA 5T SILTANOSTURISTA SAMALLE AJORADALLE SUUNNITTELUINEEN, TOIMITUKSINEEN JA ASENNUKSINEEN. Kohteen laajuustietoja seuraavasti: •Ajoratapalkit pilarikonsolien päälle 2 x 115 jm•2 kpl 1-palkkisia 5 tonnin siltanostureita. •Koukkukorkeus minimi 6000•nosturit 2 kpl radio ohjattuja •ohjaimessa kuormanäyttö •taajuusmuuttajakäyttöiset liikkeet •virransyöttökaapelit 115m matkalle •tarjoukseen kuuluttava suunnittelu valmistus, toimitus ja asennus •nosturit oltava ns. törmäyksen estimellä varustetut. •Oltava Suomalaisen lainsäädännön ja asetusten mukainen • Muista työhön liittyvistä yksityiskohdista sovitaan solmittavassa urakkasopimuksessa.
Mobiilitulostimien tarrat
Hankinnan kohteena on Satakunnan hyvinvointialueen mobiilitulostimien tarrat. Käyttökohteet laboratoriot, sairaala-apteekit ja muut yksiköt. Sopimus tulee voimaan allekirjoitushetkellä ja on voimassa kaksi vuotta. Tilaajalla on oikeus jatkaa sopimuskautta optiokaudella 1 + 1 vuotta. Hankinnan kohde ja sitä koskevat vaatimukset on kuvattu seuraavissa liitteissä: - Hintaliite (Liite 1) - Toimituksenkuvaus (Liite 2) - Sopimusluonnos (Liite 3) - Julkisten hankintojen yleiset sopimusehdot JYSE 2014 Tavarat (Liite 4) - Referenssilomake (Liite 5) Katso kohta II.1.4) Lyhyt kuvaus *.
Lemminkäisenkatu – Kiinanmyllynkadun sekä runkolinjapysäkkien rakentaminen
Urakka on kokonaishintaperusteinen kokonaisurakka, joka sisältää tilaajan laatimien rakennussuunnitelmien mukaisen rakentamisen. Urakassa Kiinamyllynkatu välillä Hämeenkatu – Lemminkäisenkatu ja Kiinamyllynkatu välillä Lemminkäisenkatu – Kätilöpolku rakennetaan kadulle ja kevyen liikenteen väylille uudet pintarakenteet, parannetaan kuivatusta sekä tehdään runkolinjapysäkkejä. Urakkaan kuuluu Kiinanmyllynkadun rakentaminen plv. 0-253, liittymä Lemminkäisenkadulta Kiinanmyllynkadulle plv. 0-40 sekä TYKS:n liittymä siinä laajuudessa kuin se sopimusasiakirjoissa on määritelty kaikkine tie- ja katujärjestelyineen, varusteineen ja laitteineen. Lisäksi urakkaan kuuluu väliaikaisten runkolinja pysäkkien ja Kiinanmyllynkadu rakentaminen plv. 40-220 siinä laajuudessa kuin se sopimusasiakirjoissa on määritelty kaikkine tie- ja katujärjestelyineen, varusteineen ja laitteineen. Urakan tarkempi kuvaus ja sisältö on esitetty tarjouspyynnön asiakirjoissa. Katso II.1.4) Lyhyt kuvaus.