The aim of the framework agreement is to cover the contracting authority ́s ongoing need for trade services within electrician services, as well as give the contracting authority access to a professionally good and financially sensible service. The framework agreement shall cover fixed inspections of electrical installations, emergency lights and fire alarm systems.
The procurement is divided into sub-contracts that are listed below. Sub-contracts 1 - 3 are divided in accordance with buildings. Sub-contract 4 applies for electrician services that are not included in sub-contracts 1 - 3. Which buildings are included in sub-contracts 1 - 3 can be seen under point 4.11, as well as annex 1.
A site inspection has been set up for selected buildings that are included in sub-contracts 1 and 2. See the date and time of the site inspection in point 4.3.
The size of the assignments within the above mentioned discipline can vary in extent.
The work assignments can be for a short or long time. There can be individual assignments or several connected assignments.
There will, however, also be the delivery of some material, as in many cases it will be appropriate that the tenderer has the material necessary for the execution of the assignment in question. Although the procurement comprises some material, emphasis is put on the fact that this contract does not give any exclusiveness on the delivery of such material, and that the Contracting Authority is not otherwise obliged to procure materials from the service provider.
The contracting authority reserves the right not to use the framework agreement supplier for major work on construction projects and/or special assignments if the contract supplier is unable to meet the contracting authority ́s needs. As major work, individual assignments with a cost framework will be seen as NOK 100,000 excluding VAT and in the case where the total assignment includes several sub-contracts. Evje and Hornnes municipalities reserve the right to use special competence on some deliveries if this has clear advantages. The contracting authority ́s self-management work will take precedence over external suppliers.
See Annex 1 as well as annexes 1.1-1.1.
| Ilmoitusnumero |
292650-2026 |
| Ilmoitusta kuvaavat CPV-Koodit |
Sähköjohto- ja asennustyöt (45311000), Muut sähköasennukset (45317000), Korjaus- ja huoltopalvelut (50000000), Sähköpalvelut (71314100) |
| EUVL S |
83/2026 |
| Ilmoitustyyppi |
Ilmoitus tehdystä sopimuksesta |
| Aluekoodi |
|
| Osoitetiedot |
Evje og Hornnes kommune Evje mattias@odinprosjekt.no https://ted.europa.eu/en/notice/-/detail/292650-2026 |
| Osoite, johon tarjoukset tai osallistumispyynnöt on lähetettävä |
|
| Liitteet |
|
| Lähde |
TED |