Restoration of Ulster Canal Phases 3.1 and 3.2 – Construction phase

Enniskillen, Irlanti | Waterways Ireland_225
Julkaistu 1 viikko sitten | 5.5.2026 Määräaika: 1 kuukausi kuluttua | 19.6.2026 15:00 Alkuperäinen ilmoitus

Ulster Canal Restoration Phase 3 is a cross jurisdictional project with works in both Northern Ireland and Ireland. When complete, Ulster Canal Restoration Phase 3 will connect the navigations of the previously constructed phases of the Ulster Canal Restoration and provide a navigable link from the Erne Navigation via the restored Ulster Canal to Clones. This competition is for the procurement of a Construction Team in respect of Phases 3.1 and 3.2 only, which extends from Castle Saunderson to Gortnacarrow. The works consist largely of the following: • Construction of a new navigation arch at Wattlebridge • Construction of a new bridge at A3 Gortnacarrow • Local realignment of roads • Construction of a marina and lock chamber • Construction of accommodation bridge • construction of 300m of new canal • Dredging of the River Finn • Associated Mechanical and Electrical engineering Works • Landscaping and parking provision

Ilmoitusnumero 308921-2026
Ilmoitusta kuvaavat CPV-Koodit Rakennustyöt (45000000), Rakenteiden rakennustyöt (45223000)
EUVL S 87/2026
Ilmoitustyyppi Hankintailmoitus (tarjouspyyntö)
Aluekoodi
Osoitetiedot Waterways Ireland_225
Enniskillen
procurement@waterwaysireland.org
https://ted.europa.eu/en/notice/-/detail/308921-2026
Osoite, johon tarjoukset tai osallistumispyynnöt on lähetettävä
Liitteet
Lähde TED