NTA25 – New terminal apron

Hafnarfjörður, Islanti | Isavia ohf
Julkaistu 2 viikkoa sitten | 15.4.2026 Määräaika: 3 viikkoa kuluttua | 20.5.2026 13:00 Alkuperäinen ilmoitus

The next phase in the expansion of Keflavík Airport, according to the airport's Masterplan, is imminent and Isavia is looking for an interested party to take part in the project.
The project is called NTA25 and involves the upgrade of the current aircraft stands 1, 3 and 5, which is a vital step in supporting the expansion of the pier between the North and South buildings of the terminal.
The project involves adjusting the elevation of the stands and apron, including laying new concrete and asphalt, changes to drainage and pipework, additions to the water and heating systems, as well as laying electrical conduits to support the airport's future vision.
Subject to Article 50(1)(f) of Directive 2014/25/EU, as a repeated purchase, the buyer reserves the right to negotiate for Stand 4, which is planned for 2030,

Ilmoitusnumero 258597-2026
Ilmoitusta kuvaavat CPV-Koodit Rakennustyöt (45000000), Lentokenttien asematasojen rakennustyöt (45235320)
EUVL S 74/2026
Ilmoitustyyppi Hankintailmoitus (tarjouspyyntö)
Aluekoodi
Osoitetiedot Isavia ohf
Hafnarfjörður
e-tenders@isavia.is
https://ted.europa.eu/en/notice/-/detail/258597-2026
Osoite, johon tarjoukset tai osallistumispyynnöt on lähetettävä
Liitteet
Lähde TED