Supply of equipment – EV Chargers

Strumica, Makedonia | Centre for development of the South-East planning region
Julkaistu 4 päivää sitten | 2.4.2026 Määräaika: 1 viikko kuluttua | 14.4.2026 16:00 Alkuperäinen ilmoitus

The contract concerns the supply, delivery, installation, connection, testing and commissioning of six
fast electric vehicle (EV) charging stations in the South­East of North Macedonia, to be installed in the municipalities
of Strumica, Gevgelija, Valandovo, Radovish, Dojran and Novo Selo. The charging stations shall be supplied in
accordance with the technical specifications defined in the tender documentation and shall fully comply with all
applicable EU safety, technical and performance standards. Each charging station will be mounted on an appropriate
concrete foundation and connected to the electrical grid, including all necessary civil, electrical and auxiliary works
required for full operational readiness. The scope of the contract includes, but is not limited to: • Supply, delivery
and installation of the EV charging stations with the technical characteristics defined in the tender specifications;
• construction of foundation bases for each charging station; • electrical connection works, including cable lines,
disconnection boxes and all required protective elements; • installation of vehicle stop elements and vertical and
horizontal traffic signage and markings related to the charging points; • testing and commissioning of the installed
equipment to ensure safe and proper operation. The contractor shall also provide training for designated local
personnel on the operation and routine maintenance of the charging stations, as well as warranty coverage and aftersales support throughout the warranty period. All required documentation, certificates of conformity, technical manuals
and as­built documentation must be delivered to ensure correct use, maintenance and long­term functionality of
the equipment. Delivery, installation, testing and commissioning of the charging stations must be completed within
the timelines defined in the project implementation schedule. The charging infrastructure is intended to promote
sustainable transport, encourage low­carbon mobility and contribute to the development of regional electric vehicle
infrastructure.

Ilmoitusnumero 231353-2026
Ilmoitusta kuvaavat CPV-Koodit Lataajat (31158000), Akunlatauslaitteet (31158100), Sähköajoneuvot (34144900)
EUVL S 66/2026
Ilmoitustyyppi Hankintailmoitus (tarjouspyyntö)
Aluekoodi
Osoitetiedot Centre for development of the South-East planning region
Strumica
southeastregion@rdc.mk
https://ted.europa.eu/en/notice/-/detail/231353-2026
Osoite, johon tarjoukset tai osallistumispyynnöt on lähetettävä
Liitteet
Lähde TED