Baggage handling system for Baggage Factory East

Kastrup, Tanska | Københavns Lufthavne A/S
Julkaistu 3 viikkoa sitten | 18.3.2026 Määräaika: 2 kuukautta kuluttua | 19.6.2026 04:27 Alkuperäinen ilmoitus

This Tender Notice apply to Københavns Lufthavne A/S’ (hereinafter the ”Contracting Entity”) invitation to tender for a contract for the purchase of a baggage handling system for Baggage Factory East (BFE-BHS) under the Defence and Security Directive (2009/81/EC).
The tender material will only be published to the prequalified tenderers once the result of the prequalification has been announced.
The tender schedule will be revised when the tender material is published.

When applying for prequalification, a candidate need submit a completed ESPD as documentation for its suitability and a signed non-disclosure agreement. Template for the non-disclosure agreement will be uploaded after the publication of the Tender Notice.

In addition to the ESPD, the applicant is encouraged to submit the following:
• Statement on Consortium (only if the applicant is a consortium)
• Commitment Letter (only if applicant relies on the capabilities of other entities)
• Declaration concerning Russia

Baggage Factory East (BFE) comprises the construction of a new BHS facility dedicated to a Baggage Handling System and Early Baggage Storage. The new Baggage Factory in Copenhagen Airport (CPH) will be located east of the existing Baggage Factory 3 (BF3) and is designed to meet future capacity needs at CPH.
The Contract is based on an Early Contractor Involvement (ECI) and will be executed in two phases; Phase 1: Development phase and Phase 2: Final design and execution phase. At the end of Phase 1, a fixed price for Phase 2 shall be agreed.

The BFE BHS project includes a large random access bag store (4500-5000 bags). It also incorporates speed loader batching stations (6-8 stations) to ensure optimal outbound operations, as well as an ICS interchange enabling transfer between belt conveyors and the ICS system, as the existing CPH BHS is belt conveyor based.
The project further includes a ULD handling system to support the batching stations. In addition, belt conveyor connections must be established to and from the existing CPH BHS system. The overall solution must provide a high degree of redundancy and ensure extensive operational flexibility for the new Baggage Factory East.
The BFE BHS project includes a complete, operable, maintainable and safe BHS on a “Design & build, turnkey basis”. The project includes all management, design, engineering, site work, installation, testing, commissioning, FATs, SATs, and all mechanical, electrical, software, steelworks and structural components required to deliver the intended BHS functionality.
The BFE-BHS will be installed in a new building with an available footprint of approximately 3800 m² for the BHS. The building will have a height of 35 meters and include a 70 meter connector bridge linking the new BFE building to the existing baggage facility. The BFE-building will be constructed landside, while the connector will be built airside. During the execution phase, the entire BFE-project area will be converted to airside operations.

The overall BFE programme is divided into two projects: the Baggage Handling System (BFE BHS) and the building, housing the BHS (BFE Build). This division necessitates a joint project development to optimize planning, coordination and management of interfaces between the two projects throughout both the project development phase and the final design and execution phase. The Contract is based on an Early Contractor Involvement (ECI) and has been prepared with inspiration from general principles of project development cooperation.
Phase 1 – is the Initial co-design phase where the BHS contractor must have a design team located in CPH together with the BFE Build contractor and CPH.
Phase 2 – Will comprise of the remaining design period (Design Stage 2) as well as the rest of the turnkey project scope including the production and execution on site all the way to the handover to CPH.
Financial incentives are included in both the BFE BHS and BHS Build contracts to support constructive collaboration and to motivate to meet the interdependent milestones between the two main contracts on time.

The project is planned to be carried out according to the following preliminary key milestones:
• Contracting and commencement of project development: September 2026
• Obtaining building permit: August/September 2027
• Start of installation: Summer/Autumn 2028
• Completion and Handover: Late 2029/start 2030

Ilmoitusnumero 189628-2026
Ilmoitusta kuvaavat CPV-Koodit Kuljetuslaitteiden asentaminen (51511400), Konttien käsittelypalvelut (63111000), Matkatavaroiden käsittely (63112000), Matkatavaroiden käsittelypalvelut (63112100), Tukkuvarastopalvelut (63122000), Matkatavaroiden käsittelyjärjestelmä (34961000), Matkatavaroiden käsittelylaitteet (34961100), Kuljettimet (42417200), Kuljetinlaitteet (42417300), Sähkölaitteiden ja mekaanisten laitteiden asentaminen (51100000), Sähkölaitteiden asentaminen (51110000), Mekaanisten laitteiden asentaminen (51120000), Käsittelylaitteiden asentaminen (51511200)
EUVL S 55/2026
Ilmoitustyyppi Hankintailmoitus (tarjouspyyntö)
Aluekoodi
Osoitetiedot Københavns Lufthavne A/S